Labor
Performance-to-standard over the work-item ledger (frozen standards, uncapped, gaps flagged), the shift roster with its publish horizon (published days are frozen; unpublish is the one way back), per-worker availability, and the headcount forecast from the same demand engines planning uses.
—
Performance to standard
—◔
No completed work yet
PtS reads done work items: actual = done − claim, standard = the frozen mint stamp.
Roster — next 7 days
Headcount forecast
—◫
Nothing to forecast
Heads = expected minutes (forecast demand × standards + open WO ops) ÷ shift minutes, ceiled last.
Availability
Everyone is available this week (only exceptions are stored).
Labor standards
blank minutes clears; the stamp freezes at mint — existing items never move
No standards yet — new work items mint with an honest no-standard gap.